 |
Space Shuttle program Totally Explained
|
|  |
|
NEW! |
All the latest news in the worlds of
computer gaming,
entertainment,
the environment,
finance,
health,
politics,
science,
stocks & shares,
technology
and much,
much,
more.
|
Everything about Space Shuttle Program totally explainedNASA's Space Shuttle, officially called Space Transportation System ( STS), is the United States government's current manned launch vehicle. The winged Space Shuttle orbiter is launched vertically, usually carrying five to seven astronauts (although eight have been carried) and up to 50,000 lb (22 700 kg) of payload into low earth orbit. When its mission is complete, the Shuttle can independently move itself out of orbit (by means of its maneuvering thrusters) and re-enter the Earth's atmosphere. During descent and landing, the Shuttle Orbiter acts as a glider and makes a completely unpowered landing.
The Shuttle is the only winged manned spacecraft to achieve orbit and land, and the only reusable space vehicle that has ever made multiple flights into orbit. Its missions involve carrying large payloads to various orbits (including segments to be added to the International Space Station), providing crew rotation for the International Space Station, and performing service missions. The orbiter can also recover satellites and other payloads from orbit and return them to Earth, but its use in this capacity is rare. However, the Shuttle has previously been used to return large payloads from the ISS to Earth, as the Russian Soyuz spacecraft has limited capacity for return payloads. Each vehicle was designed with a projected lifespan of 100 launches, or 10 years' operational life.
The program started in the late 1960s and has dominated NASA's manned operations since the mid-1970s. According to the Vision for Space Exploration, use of the Space Shuttle will be focused on completing assembly of the ISS by 2010, after which it'll be retired from service, and eventually replaced by the new Orion spacecraft (now expected to be ready in about 2014).
Conception
Even before the Apollo 11 moon landing in 1969, NASA began early studies of space shuttle designs. The early studies beginning in October, 1968 were denoted "Phase A." Further studies resulted in "Phase B" in June 1970. These plans were much more detailed and more specific.
In 1969 President Richard Nixon formed the Space Task Group, chaired by vice president Spiro T. Agnew. This group evaluated the shuttle studies to date, and recommended a national space strategy including building a space shuttle.
In October 1969, at a Space Shuttle symposium held in Washington, George Mueller (NASA's deputy administrator) presented opening remarks:
NASA has proposed that a space shuttle be developed for U.S. Space Transportation needs for NASA, the Department of Defense (DOD), and other users in the 1980s.The primary objective of the Space Shuttle Program is to provide a new space transportation capability that will:
- reduce substantially the cost of space operations and
- provide a future capability designed to support a wide range of scientific, defense, and commercial uses.
Development
During early shuttle development there was great debate about the optimal shuttle design that best balanced capability, development cost and operating cost. Ultimately the current design was chosen, using a reusable winged orbiter, solid rocket boosters, and an expendable external tank. Amid great fanfare, the Enterprise was rolled out on September 17, 1976, and later conducted a successful series of glide-approach and landing tests that were the first real validation of the design.
The first fully functional Shuttle Orbiter was the Columbia, built in Palmdale, California. It was delivered to Kennedy Space Center on March 25, 1979, and was first launched on April 12, 1981—the 20th anniversary of Yuri Gagarin's space flight—with a crew of two. Challenger was delivered to KSC in July 1982, Discovery in November 1983, and Atlantis in April 1985. Challenger was destroyed during ascent due to O-Ring failure on the right SRB on January 28, 1986, with the loss of all seven astronauts on board. Endeavour was built to replace Challenger (using spare parts originally intended for the other orbiters) and delivered in May 1991; it was first launched a year later. Seventeen years after Challenger, Columbia was lost, with all seven crew members, during reentry on February 1, 2003, and hasn't been replaced. Out of the five fully functional shuttle orbiters built, three remain.
Shuttle applications
Current and past Space Shuttle's applications include:
Crew rotation and servicing of Mir and the International Space Station (ISS)
Manned servicing missions, such as to the Hubble Space Telescope (HST)
Manned experiments in Low Earth orbit (LEO)
Carried to LEO:
Carried satellites with a booster, the Payload Assist Module (PAM-D) or the Inertial Upper Stage (IUS), to the point where the booster sends the satellite to:
- A higher Earth orbit; these have included:
- An interplanetary orbit; these have included:
Flight statistics
Other shuttles
| Shuttle |
Flight Days |
Orbits |
Distance -mi- |
Distance -km- |
Flights |
Longest flight -days- |
Crew and passengers |
EVAs |
Mir/ISS docking |
Satellites deployed |
|
0.014 |
0 |
Unknown |
Unknown |
0 |
0.004 |
>3 |
0 |
0 / 0 |
0 |
Disasters
As of April 2008, two Shuttles have been destroyed in 123 missions, both with the loss of the entire crew (14 astronauts total):
Challenger — lost 73 seconds after liftoff, STS-51-L, January 28, 1986
Columbia — lost approximately 16 minutes before its expected landing, STS-107, February 1, 2003
This gives a 2% death rate per astronaut-flight, and an average failure rate of more than 1 every 60 missions. The original disaster potential, though disaster isn't defined as fatal or non-fatal, was estimated during Shuttle development at one every 75 missions. 87 successful missions were flown between STS-51-L and STS-107.
Current status
After the Space Shuttle Columbia disaster in 2003, the International Space Station operated on a skeleton crew of two for more than two years and was serviced primarily by Russian spacecraft. While the "Return to Flight" mission STS-114 in 2005 was successful, a similar piece of foam from a different portion of the tank was shed. Although the debris didn't strike the orbiter, the program was grounded once again for this reason.
The second "Return to Flight" mission, STS-121, launched on July 4, 2006, at 2:37:55 p.m. (EDT), after two previous launches were scrubbed because of lingering thunderstorms and high winds around the launch pad and the launch took place despite objections from its chief engineer and safety head. A five-inch (13 cm) crack in the foam insulation of the external tank gave cause for concern; however, the Mission Management Team gave the go for launch. This mission increased the ISS crew to three. Discovery touched down successfully on July 17, 2006 at 9:14:43 a.m. (EDT) on Runway 15 at Kennedy Space Center.
Following the success of STS-121, seven missions have been completed without major foam problems, and the construction of ISS has resumed. (During the STS-118 mission in August 2007, the orbiter was again struck by a foam fragment on liftoff, but this was a very small damage compared to the damage sustained to Columbia.)
On October 31, 2006, NASA announced approval of a shuttle servicing mission to the Hubble Space Telescope. This mission is designated STS-125 and is scheduled for October 8, 2008.
The Shuttle program is scheduled for mandatory retirement in 2010. The Shuttle's planned successor is Project Constellation with its Ares I and Ares V launch vehicles and the Orion Spacecraft. NASA plans to launch 9 to 11 more shuttle missions before the program ceases.
U.S. Representative Dave Weldon has introduced H.R. 4837, known as the SPACE Act. This legislation would keep the Space Shuttle flying past 2010 at a reduced rate until the Orion spacecraft is ready to replace it. It would allow both the Alpha Magnetic Spectrometer as well as the completed-but-unused Centrifuge Accommodations Module to be launched to the ISS, which the current schedule doesn't allow. The bill is currently in committee.
From September 2005 until early 2008, the manager of the Space Shuttle program was Wayne Hale. Hale then became NASA's deputy associate administrator for strategic partnerships. John Shannon, who had been Hale's deputy since November 2005, succeeded him as the Space Shuttle Program manager.
Costs
The total cost of the Shuttle program has been $145 billion as of early 2005, and is estimated to be $174 billion when the Shuttle retires in 2010. NASA's budget for 2005 allocated 30%, or $5 billion, to Space Shuttle operations; this was decreased in 2006 to a request of $4.3 billion.
Per-launch costs can be measured by dividing the total cost over the life of the program (including buildings, facilities, training, salaries, etc) by the number of launches. With 115 missions (as of 6 August 2006), and a total cost of $150 billion ($145 billion as of early 2005 + $5 billion for 2005,.
Early cost estimates of $118 per pound ($260/kg) of payload were based on marginal or incremental launch costs, and based on 1972 dollars and assuming a 65,000 pound (30 000 kg) payload capacity. Correcting for inflation, this equates to roughly $36 million incremental per launch costs. Compared to this, today's actual incremental per launch costs are about two thirds more, or $60 million per launch.
Criticism
The Space Shuttle program has been criticized for failing to achieve its promised cost and utility goals, as well as design, cost, management, and safety issues.
After both the Challenger disaster and the Columbia disaster, high profile boards convened to investigate the accidents with both committees returning praise and serious critiques to the program and NASA management. One of the most famous of these criticisms came from Nobel Prize winner Richard Feynman.
Terrestrial transportation vehicles
The Crawler-Transporter carries the Mobile Launcher Platform and the Space Shuttle from the Vehicle Assembly Building to Launch Complex 39.
The Shuttle Carrier Aircraft are two modified Boeing 747s. Either can fly an orbiter from alternative landing sites back to Cape Canaveral.
A 36-wheeled transport trailer, the Orbiter Transfer System, originally built for the U.S. Air Force's launch facility at Vandenberg Air Force Base in California (since then converted for Delta IV rockets) that would transport the orbiter from the landing facility to the launch pad, which allowed both "stacking" and launch without utilizing a separate VAB-style building and crawler-transporter roadway. Prior to the closing of the Vandenberg facility, orbiters were transported from the OPF to the VAB on its undercarriage, only to be raised when the orbiter was being lifted for attachment to the SRB/ET stack. The trailer allows the transportation of the orbiter from the OPF to either the SCA-747 "Mate-Demate" stand or the VAB without placing any additional stress on the undercarriage.
The Crew Transport Vehicle (CTV), a modified airport "People Mover", is used to assist astronauts to egress from the orbiter after landing. Upon entering the CTV, astronauts can take off their launch and re-entry suits then proceed to chairs and beds for medical checks before being transported back to the crew quarters in the Operations and Checkout Building.
The AstroVan is used to transport astronauts from the crew quarters in the Operations and Checkout Building to the launch pad on launch day. It is also used to transport astronauts back again from the Crew Transport Vehicle at the Shuttle Landing Facility.Further Information
Get more info on 'Space Shuttle Program'.
|
External Link Exchanges
Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:
<a href="http://space_shuttle_program.totallyexplained.com">Space Shuttle program Totally Explained</a>
Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned. |
|
|